PORTFOLIO

Greenland is known for a history of successful projects completed on time and on budget.  Our past performance portfolio contains a variety of projects, from a $1 million medical gas system upgrade to a $21 million project involving a new central plant from the ground up.  Below are a few representative examples of our project performance.  Please contact our corporate headquarters if you would like more information regarding a specific type of project.

Columbia, SC New Boiler Plant:

Greenland Enterprises is currently the prime contractor responsible for constructing a new $16M boiler house for the William Jennings Bryan Dorn VAMC in Columbia, South Carolina. The boiler house will include three new 600HP water tube boilers and a relocated 400HP fire tube summer boiler. The boiler house will include space for parts, maintenance, tools, training room, locker rooms, restrooms and a break room for the boiler plant staff. Read more…

El Paso, TX Central Chilled-Water Plant:

Greenland completed a project for the El Paso VA Medical Center to upgrade the hospital’s central chilled-water plant. The primary driver for the project’s scope of work was the degraded condition of the existing three (3) cooling tower cells, which posed significant risk to facility operations as most of the cooling for the hospital relied on the operability and reliability of this failing equipment. Read more…

Martinsburg, WV Boiler Plant Upgrade:

Greenland was selected as the Prime Contractor to complete the VAMC Martinsburg, West Virginia Boiler Plant Upgrade Phase V project. This $7M+ project consists of complete demolition of all components inside the existing Boiler plant, which was built in the 1940’s.  This included asbestos abatement for all piping insulation, remove/replace concrete floor and also replace the roof. Read more…

Williamsburg, VA Special Collections Library HVAC Upgrade:

Greenland was selected on this negotiated HVAC upgrade for the SWEM Library Special Collections Area at The College of William & Mary. The 12,000 square foot area houses important historical documents as well as documents pertaining to the College itself.  These important documents are irreplaceable. Read more…

Waco, TX Central Energy Center:

Greenland-imag1The Central Texas Veterans Health Care System (CTVHCS) at the Waco, Texas Veterans Administration Medical Center (VAMC) engaged Greenland Enterprises for a $20M+ project to replace an existing boiler plant, chiller plant and related infrastructure with a new consolidated energy center. Read more…

Martinsburg, WV Chiller Replacement

chiller replacement construction companyGreenland was selected as the prime contractor to demolish and reconstruct the Chilled Water Plant at the Martinsburg, WV VA Medical Center under a $5.4M DB Best Source Selection contract. The project included replacing pipes, pumps, three centrifugal chillers, cooling towers, and all associated controls systems. The entire electrical system was demolished and replaced with new wiring, switch gear, and motor control centers. The actual construction began in November 2010 and was substantially complete in May 2011. Read more…

Boston, MA Packaged Chiller Plant

The second-to-last module is placed late Sunday morning.

In July 2015, Greenland orchestrated the field assembly of a 5,000 sq. ft., 1,250-ton packaged chiller plant at the VA Medical Center in Jamaica Plain, MA. This required the sequential placement of 14 modules, each approximately 25 ft. long by 14 ft. wide, and each weighing upwards of 53,000 pounds. Each module was packed and shipped from the factory in Ohio to a storage yard outside Boston – before being threaded through the streets of Boston in a carefully orchestrated operation on their way to the VA Medical Center in Jamaica Plain. Read more…

Richmond, VA Cooling Tower Replacement

IMG_1935Greenland Enterprises performed a complex cooling tower replacement on the roof of The Madison Building in downtown Richmond, VA, 200 feet above ground. Because of our expertise in cooling tower systems, executing complex replacements and scheduling, we were able to minimize downtime and improve reliability of the central plant. Read more…

Waco, TX Combined Heat & Power Plant

greenland-portfolio-menu-imageIn March 2016 Greenland Enterprises completed a $9.4 million Combined Heat and Power (CHP) Plant addition at the Doris Miller VA Medical Center in Waco, TX. The ground-up addition included installing a natural gas fired turbine generator, heat recovery steam generator and fuel gas compressor. Read more…

 

Additional Past Performance

$39M in Chilled Water Systems

  • Ground-up new chiller plants
  • Cooling tower replacements
  • Pumping upgrades
  • Chiller replacements
  • Piping upgrades
  • Free cooling

$10M in Critical Air Handler Projects

  • Healthcare facilities
  • Weapons facilities
  • Process facilities

$35M in Steam and Hot Water Systems

  • Ground-up boiler plants
  • Boiler plant upgrades
  • Boiler plant master controls
  • Heat recovery systems
  • Boiler plant subsystems
  • Piping modifications

$16M in BAS Control Systems

  • Healthcare facilities
  • Advanced utility meters
  • Process facilities

Contact us today for more details about these or any other central plant and similar construction projects.