As the largest energy consumer in a facility, Central Utility Plants like the one pictured above offer significant opportunities to improve energy efficiency.

We welcome your inquiries.
Click here to contact Greenland Enterprises today.
 
     
Mechanical Systems


Richmond VA Medical Center, Design Build Boiler Controls Upgrade Retrofit
Installed as original equipment in 1982, the existing boiler combustion and burner management controls were replaced and re-commissioned. This project was design build with Greenland managing all aspects.

Greenland Enterprises, Inc.

Greenland Enterprises, Inc.
Greenland Enterprises, Inc.

Defense Commissary Agency Headquarters, Chiller and Cooling Tower Replacement
Greenland Enterprises provided construction services on a best source selection to replace the chiller, cooling tower, pumps, controls, and variable frequency drives at the Defense Commissary Agency Headquarters building at Ft. Lee, Virginia.

Greenland Enterprises, Inc.

Greenland Enterprises, Inc.
Greenland Enterprises, Inc.

Williamsburg James City County Courthouse, Chiller Replacement
Greenland Enterprises was contracted on a best source selection to provide a design build, turnkey solution to replace the existing 250 Ton chiller while keeping the building operational. This project was completed in 24 hours.

Greenland Enterprises, Inc.

Greenland Enterprises, Inc.
Greenland Enterprises, Inc.

Department of Transportation, Admin Building Geothermal System Installation
Leading the way in geothermal technology and energy efficiency, the DOT contracted with Greenland Enterprises on a best source selection, design build project to install a geothermal system to meet the cooling and heating requirements of the administration building located at Ft. Eustis Virginia. The project was completed in three weeks.

Durham VA Medical Center, Chiller and Boiler Plant Separation
This project involved physically separating two buildings with a block wall to meet the ASHRAE 15 guidelines for refrigerant monitoring, and combustion air control. This project was completed in sixty days.

Federal Aviation Administration/ Parsons, Replace HVAC Systems at Richmond International, Norfolk International, and Shenandoah Regional Airport
Greenland Enterprises was selected to replace the equipment cooling units that serve critical navigation equipment at all three locations. The equipment was pre-staged and replaced in approximately two days at each site.

     
Greenland Enterprises, Inc. 47 W. Queens Way Hampton, Virginia 23669 Ph: (757) 864-0640 Fax: (757) 864-0876
Veteran Owned Small Business
U.S. Green Building Council Member
Verified Service Disabled Veteran Owned Small Business | Member U.S. Green Building Council | Email: info@greenlandenterprises.com
Website Design Company | VISIONEFX